Skip to the main content.

Owner Approach

Focused on owner’s requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

Services 

Owner Approach | Conspectus

 

Contact Us

    Architect Approach

    Focused on architect's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

    Services 

    Architects | Conspectus Inc

     

    Contact Us

      Design-Builder Approach

      Focused on design-builder's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

      Services 

      Design-Builders | Conspectus Inc

       

      Contact Us

        Construction Manager Approach

        Focused on construction manager's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

        Services 

        Construction Managers | Conspectus Inc

         

        Contact Us

          What binder, density, and bond strength are required for sprayed fire-resistive materials? New building code requirements include additional considerations for bond strength in buildings greater than 75 feet high. Careful choices must be made when specifying SFRM to ensure comparable products and fair competitive bidding.

          Visit https://www.conspectusinc.com/viewtechtips.htm to view or download the latest B1010 SFRM Types and Applications 12.10.01 and all previous Tech Tips.

          Share your comments, your opinions, about this month's Tech Tips, by posting a comment, here.