Skip to the main content.

Owner Approach

Focused on owner’s requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

Services 

Owner Approach | Conspectus

 

Contact Us

    Architect Approach

    Focused on architect's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

    Services 

    Architects | Conspectus Inc

     

    Contact Us

      Design-Builder Approach

      Focused on design-builder's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

      Services 

      Design-Builders | Conspectus Inc

       

      Contact Us

        Construction Manager Approach

        Focused on construction manager's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

        Services 

        Construction Managers | Conspectus Inc

         

        Contact Us

          Blog

          Sign Up Today

          Interested in keeping up with our blog? Sign up by clicking below.

          Sign Up

          3 min read

          Why are Preliminary Project Descriptions (PPDs) Important?

          Short Answer: PPDs document the architect's intended project quality.

          Read More

          1 min read

          CSI Academies - Valuable Advanced Education

          Continuing education can be valuable. Really, it can - especially when it offers a new idea or when it offers a solution to an existing problem and...

          Read More

          2 min read

          Ensuring Specifications Consistency & Quality

          How can architects ensure their specifications are consistent from one project to the next or one project architect to the next? How can architects...

          Read More

          1 min read

          Are Peer Reviews Effective?

          The project was a new single family residence. The architect wrote the specifications as notes to be placed on the drawings. The architect asked for...

          Read More

          2 min read

          Substitution Evaluations: What is the Architect's Obligation?

          This morning I opened my email to find a client, an architect, requesting a substitution evaluation for a metal wall panel. The request was sent 8 PM...

          Read More

          What's Wrong with This Picture?

          Have you ever seen a built detail, scratched your head, and wondered: "What were they thinking?" There are 4 steps that can be taken to help prevent...

          Read More

          3 min read

          Let's Win the Concrete Floor Moisture Battle - Together

          Impervious flooring. Water-based adhesives. Fly ash and slag pozzolans. Vapor retarders. Extreme surface pH. Fast-track scheduling. All are coming...

          Read More

          1 min read

          Need Help at 11th Hour? Join CSI

          Who are the first sources of product information, especially when it is 6 PM and the spec must be issued the next day? CSI members! I know I can rely...

          Read More

          Blog Sign Up