Skip to the main content.

Owner Approach

Focused on owner’s requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

Services 

Owner Approach | Conspectus

 

Contact Us

    Architect Approach

    Focused on architect's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

    Services 

    Architects | Conspectus Inc

     

    Contact Us

      Design-Builder Approach

      Focused on design-builder's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

      Services 

      Design-Builders | Conspectus Inc

       

      Contact Us

        Construction Manager Approach

        Focused on construction manager's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.

        Services 

        Construction Managers | Conspectus Inc

         

        Contact Us

          Blog

          Sign Up Today

          Interested in keeping up with our blog? Sign up by clicking below.

          Sign Up

          2 min read

          Importance of Tables of Contents

          Tables of Contents are a valuable coordination tool to ensure the project manual includes everything required without duplication or conflict. The first step for writing construction specifications is to create the table of contents listing the...

          Read More

          1 min read

          Impractical Surface Bolts

          Top and bottom surface bolts are used on the inactive leaf of pairs of doors. The bolts hold the door closed until the full door opening is require....

          Read More

          1 min read

          Lavatory Exposed Pipe Insulation

          Accessibility standard ANSI A117.1 requires exposed water supply and drain pipes to be insulated or configured to prevent contact. Here is a lavatory...

          Read More

          Large Format Tile Revisited

          The publication of 2011 versions of the TCNA Handbook and ANSI A108, A118, and A136 addressed the challenges in large format tile installations. This...

          Read More

          Consider the Consequences

          It must have seemed a good idea at the time - inexpensive, easy to install. Add a barrier to keep objects from falling from one parking level to...

          Read More

          3 min read

          Specs Must State the Architect's Intent

          "Why is it that Architects specify 'Intent' and can not specify what products they require? I have a real problem trying to price an Architect's...

          Read More

          1 min read

          Construction Improvisation; Acceptable Quality?

          Construction sites often present challenges for completing the work as the architect intended. But when contractors improvise, the results may not be...

          Read More

          1 min read

          Succeeding with Substitution Requests, Contractors

          This month's Tech Tip, geared toward product reps, is a good start to ANYONE interested in proposing substitutions. Randy makes a few excellent...

          Read More

          Succeeding with Substitution Requests, Product Reps

          For product sales representatives, the key to getting products included in specifications during the Procurement (Bidding) Phase is understanding the...

          Read More

          3 min read

          Coordinating Drawing Notes and Specs

          The need to coordinate drawings and specifications may seem obvious, but why is it so important? There are two primary reasons:

          Read More

          Blog Sign Up