3 min read
Let's Win the Concrete Floor Moisture Battle - Together
Impervious flooring. Water-based adhesives. Fly ash and slag pozzolans. Vapor retarders. Extreme surface pH. Fast-track scheduling. All are coming...
Focused on owner’s requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on architect's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on design-builder's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
Focused on construction manager's requirements, Conspectus offers an accurate, transparent view of how decisions made during the design process will ultimately impact project cost, construction quality, and building operations.
3 min read
Impervious flooring. Water-based adhesives. Fly ash and slag pozzolans. Vapor retarders. Extreme surface pH. Fast-track scheduling. All are coming...
3 min read
The architect asked that I review the "front end" documents written by the design-builder for a new construction project. The front end including...
2 min read
An architect recently asked that I give an opinion about a shop drawing and what was actually installed on a project site. The installation was...
3 min read
An interesting question--no doubt about it! More than 90 Specifying Practice Group members, an attendance record, met last week to discuss it.
1 min read
We have all seen it. Business cards with initials after the name that won't quit. Heck, some have resorted to a separate line and smaller font. I...
1 min read
Consultant specifications delivered to architects for inclusion in project manuals can produce some interesting coordination issues, especially when...
2 min read
I heard specs mentioned once in school. It was in one class of the professional practice course - the 30 hour course to teach students everything...
3 min read
Thanks to Liz O'Sullivan for the first Bad Specs entry. 088000 glazing tech guide.pdf Send your own examples to me at dstutzman@conspectusinc.com.
1 min read
Last week, a friend received a request for a bid from a Construction Manager. How the Construction Manager expected to get valid bids with the spec...